Lime at the Beach, new residence.
Sullivan's Island · Every project, told the same way: problem, method, outcome. The sequence is the proof of the work.
What the house asked
A new house on the island with fine cracking and patchy color across three chimneys, the cabana fireplace and the pool surround. The stucco was new. It already looked tired.
What we chose
Agree the finish on a sample before touching the walls. Then rebuild the surface as a system: full reinforcing mesh set into a bond plaster base on every chimney, a cement board backer at the fireplace, and a fine lime finish tinted Storm, screened from sun and wind while it cured.
What it became
Chimneys and walls that read as one soft, even surface, with the movement and depth only lime gives, and a finish that can take the salt air rather than fight it.
Lime, built as a system.
The finish is the last coat of a wall that has to work underneath it. Every step was agreed, layered and cured before the next one started.
-
01Read the wall
Every crack and color change marked on each chimney before anything came off, so the scope matched what the wall was actually doing.
-
02Sampled in place
Finish and color worked out on boards against the chimney itself, in its own light, until the owner and the builder agreed on Storm.
-
03Screened for the cure
Each chimney wrapped in screen on its scaffold, so the lime set slowly out of direct sun and wind.
-
04Built in layers
Full reinforcing mesh set into a bond plaster base, then the finish coat over it. The layers do the structural work; the finish does the looking.
-
05Lime in Storm
A fine lime finish, tinted Storm, troweled to a soft, even face that keeps the slight movement lime is known for.
-
06Settled
An even surface from base to cap, ready for salt air and summer sun.
Screened, layered, cured.
Three chimneys, a cabana fireplace and the pool surround, each wrapped and worked from inside its screen, then opened once the lime had set.
In progress
-
Under the screen Scaffold and screen around a chimney while the base and finish coats go on. -
Inside the wrap Working from the scaffold inside the screen, out of the wind. -
Unwrapped The finished chimney once the screen came down.
Finished
-
Pool surround and chimney, one finish. -
The cabana fireplace, on a cement board backer. -
A chimney on the side path. -
Even color from base to cap. -
The pool surround, filled and planted. -
The finish up close.
New stucco near the ocean can start to crack and bloom before the paint is dry on the trim. That is the situation our Field Note, Stucco At the Beach, describes, and this house is where we worked through it. The stucco was new, and it already showed spider cracking and uneven color on every chimney.
We did not start on the walls. We made sample boards on site, side by side against the chimney, until the finish and the color were agreed. Only then did the work begin: full reinforcing mesh set into a bond plaster base on all three chimneys, a cement board backer at the cabana fireplace, and a fine lime finish tinted Storm over everything. Each chimney was screened in while it cured, so the lime set slowly and evenly instead of drying in the wind.
Lime moves with a wall and lets moisture leave it. On a house that lives in salt air, that is the whole point.